INTERNAL JOB COST DIFFERENCE REVIEW Manual worksheet. Not a Fieldnox costing module or complete accounting ledger. Use consistent cost policies and one stated currency. Keep internal rates, supplier costs and review notes separate from customer-facing documents. Repeat sections/rows as needed. Blank means unknown, not zero. JOB AND BASIS Job ID / site: Reviewer / review date: Currency: Included cost categories / cost policy reference: Exclusions (overhead / taxes / revenue / other): Time basis: PERSON-HOURS (not elapsed visit duration) Waiting / travel / breaks treatment: Original scope / estimate reference / version / date: BASELINES — do not replace the original Original labor: person-hours x internal rate / amount: Original materials / amount: Original other included costs / amount: A. Original job cost budget: Approved change ID / date / scope / approval reference: Customer price agreement reference (separate from internal cost allowance): Added/reduced internal cost allowance / category / basis: B. Net approved internal budget adjustments: C. Revised job cost budget = A + B: ACTUAL COST ENTRIES — repeat one row per unique cost allocation Entry ID / date / category / task or change ID: Worker, if labor / person-hours / internal cost rate / amount: Material, if applicable / quantity USED / unit / allocated cost / amount: Other included cost, if applicable / amount: Return or credit adjustment / basis: Source timesheet / receipt / stock issue / other reference: Allocation check: Is this amount already included in another entry? D. Total actual recorded job cost: DIFFERENCES E. Difference from original budget = D - A: F. Difference from revised budget = D - C: EXPLANATION ROW — repeat, with separate, non-duplicated cost effects Explanation ID / affected entry IDs: Category: original-scope estimate / changed scope / waiting / rework / rate or purchase-price change / allocation correction / unexplained / other Non-duplicated amount of E explained by this row: Observed facts / time allocation / source cost reference: Photo reference / location / stage / caption: Supporting task note / approval reference: Review decision / limits of evidence: RECONCILIATION G. Sum of explained amounts (signed values): H. Remaining unexplained amount = E - G: Do not force H to zero by inventing a reason. Missing information / owner / target date: Original and revised views retained? Yes / No No duplicate time or material allocations? Yes / No / Unresolved Consistent cost basis and currency? Yes / No / Unresolved REVIEW ACTION Decision / reviewer / date: One estimating or operational action to test: Responsible person / target date / follow-up review: SEPARATE CUSTOMER SUMMARY — copy only supported client-relevant facts Job / agreed scope: Completed work / change references: Relevant photos / checks actually performed / limits: Open actions / responsible person / target date: Acknowledgment obtained / exactly what was confirmed: Commercial approval or price reference, where appropriate: EXPORT REVIEW Confirm no internal hourly cost, supplier cost, margin, staff discussion or private review note appears in the intended customer report or shared link. Review any customer charge separately against the applicable agreement and authorization. Internal cost variance is not an automatic customer charge.